Inventory Management

Supply Chain Optimization Sheet

Analyze and optimize your supply chain efficiency with comprehensive performance tracking

Get this built around your data

✓ Free to download  ·  ✓ Excel 2016+ and Google Sheets  ·  ✓ Custom version in 24h

Optimisation starts with knowing where the money and the time actually go. This template lays out cost-to-serve and lead time by node so the expensive parts of the chain are visible before anyone changes anything.

What the worksheet looks like

The actual columns, with sample rows

Lanes sheet: cost and time per route, the basis for any optimisation.
ABCDEFG
1LaneModeLead (d)Cost/unitVolumeAnnual cost
2CN → EU (Rotterdam)Sea340.84412,000346,080
3CN → EU (air)Air64.1038,000155,800
4EU DC → FRRoad20.31188,00058,280
5EU DC → DERoad20.29164,00047,560

The formulas that do the work

Why each one is written the way it is

  • =[@[Cost/unit]]*[@Volume] Annual cost per lane. Ranking lanes by total cost rather than unit cost is what identifies where effort is worth spending.
  • =[@[Lead (d)]]*[@[Daily demand]]*[@[Unit cost]] Pipeline inventory value — capital tied up in transit. Long sea lanes look cheap per unit and are not once this is counted.
  • =SUMPRODUCT(Lanes[Lead (d)],Lanes[Volume])/SUM(Lanes[Volume]) Volume-weighted average lead time. The plain average flatters you by giving a rarely-used air lane the same weight as the main sea route.
  • =ROUNDUP(AVERAGE(Demand[Daily])*([@[Lead (d)]]+ReviewPeriod)+SafetyStock,0) Order-up-to level per lane, which is where lead time turns into working capital.

Air freight that was cheaper than it looked

A worked example with real numbers

An importer moved 8% of volume by air at five times the sea rate and considered it a failure of planning. Adding pipeline inventory to the comparison changed the picture: the 34-day sea lane tied up €71k of capital continuously against the air lane's €4k. The air share was not the problem — it was the only thing keeping stockouts down while the sea lead time went unaddressed. Negotiating a 26-day lane saved more than eliminating air freight would have.

What is in the workbook

Tab by tab

Every tab in the workbook and what it is for.
TabContents
LanesRoute, mode, lead time, unit cost and volume.
DemandDaily demand by destination, driving safety stock.
InventoryPipeline and safety stock value per lane.
ScenariosSide-by-side comparison of routing options.
READMEWhat is included in cost per unit and what is not.

Features and related templates

What is included, and what to look at next

What it does

  • Lead time analysis
  • Inventory optimization
  • Supplier performance metrics
  • Transportation cost analysis
  • Network optimization
  • Demand forecasting
  • Risk assessment
  • Cost-benefit analysis

Need it adapted?

  • Built around your own data and column names
  • Connected to your source system
  • Delivered within 24 hours

Questions about this template

Specific to this workbook, not generic

What should cost per unit include?

Freight, duty, insurance and handling — everything that varies with the shipment. Excluding duty is the most common omission and it can be 8–12% on its own.

How do I compare sea and air fairly?

By including the capital tied up in transit. Sea is cheaper per unit and holds far more of your money for far longer; the comparison is meaningless without it.

Is a spreadsheet enough for network optimisation?

For comparing a handful of defined options, yes. For genuine multi-echelon optimisation across dozens of nodes, you need a solver — the spreadsheet is where you prepare and sanity-check the inputs.

"This optimization tool has helped us identify and eliminate inefficiencies throughout our supply chain. We've reduced costs by 25% and improved delivery performance significantly."

- Amanda L., Supply Chain Director